Masonry Confinement Using Steel Strips
Main Article Content
Abstract
Article Details
Issue
Section
References
Economic Survey of Pakistan, Ministry of Finance, Chapter 15, Energy Sector of Pakistan, Islamabad, Pakistan. (2006), 219-225.
Annual Report; Sui Northern Gas Pipelines Limited (SNGPL), Lahore, Pakistan (2006), 5- 11.
Iran-Pakistan-India (IPI) Pipeline Pre-feasibility report by Hagler Bailly Pakistan. Islamabad, Pakistan, (2006), 111-119.
Syed Hassan Nawab; Proc. 3rd Pakistan oil & gas conference, Islamabad, Pakistan, (2007), 136-145
Amberish K. D.; A pipeline through Pakistan, Dehli, India (2004), 131-137.
John W., Edward G.; International Project Risk Assessment: Methods, Procedures, and Critical Factors (Center Construction Industry Studies, Report No. 31, The University of Texas at Austin) Austin, Texas. (2003), 41-49.
FIDIC © Conditions of contract for construction. (Multilateral Development Bank Harmonized Edition). Geneva, Switzerland. (2005), 217-229.
Armbruster J.; Research Journal, 83(1978) 88- 91.
Mahdi S., Muhammad S.; Proc. 1st International Conference on Earthquake Engineering (ICCE), Lahore, Pakistan, (2006), 177-182.
D'Appolonia E.; Proc. of 9th International Conference on Soil Mechanics and Foundation Engineering,Tokyo, Japan, 4(1979), 410-414.
PMBOK® Guide; A Guide to the Project Management Body of Knowledge, 3rd Edition, PA, USA, (2004), 237-264.
Peter C., Robert P.; Proc. 2nd International Deepwater Pipeline Technology Conference. London, UK, (1999), 291-297.
Conditions of Contract for EPC/Turnkey Projects, Guidance for the preparation of the particular Conditions Forms of Tender, Contract Agreement and Dispute Adjudication Agreement, USA, (1999), 4-12.
Sher Muhammad Ch.; Introduction to statistical theory, Ilmi Kitab Khana, Urdu Bazar, Lahore, Pakistan, 6th Ed, (1996), 361-370.
Susan R. P.; Proc. Int. Conference on Risk Assessment and Policy Association meeting in Alexandria, Virginia, (1997), 245-255.
Brenda McCabe; Proc. Int. Conference on Simulation, Toronto, Canada, (2003), 1561- 1565.
Jack R., Meredith, Samuel J., Mantel Jr.; Project Management, 5th Ed, NJ, USA, (2002), 191- 105.
Wells Louis, Gleason Eric; Harvard Business Review Journal, 73(5)(1995) 44-54.
CPM 128: Project Management Boot Camp, (2006), 11.1-11.30.
www.intaver.com/accessed on 10th March, 2007
Annual Flood Report; Ministry of Water and Power, Islamabad, Pakistan, (2006), 1-5 also available online on http://www.pakistan.gov.pk/ministries/index.jsp ?MinID=24&cPath=291.
User’s Guide to RiskyProject Professional 1.3, Intavar Institute Inc., USA, (2006), 31-38.
ACCESS