Masonry Confinement Using Steel Strips
Main Article Content
Abstract
Article Details
References
Economic Survey of Pakistan, Ministry of Finance, Chapter 15, Energy Sector of Pakistan, Islamabad, Pakistan. (2006), 219-225.
Annual Report; Sui Northern Gas Pipelines Limited (SNGPL), Lahore, Pakistan (2006), 5- 11.
Iran-Pakistan-India (IPI) Pipeline Pre-feasibility report by Hagler Bailly Pakistan. Islamabad, Pakistan, (2006), 111-119.
Syed Hassan Nawab; Proc. 3rd Pakistan oil & gas conference, Islamabad, Pakistan, (2007), 136-145
Amberish K. D.; A pipeline through Pakistan, Dehli, India (2004), 131-137.
John W., Edward G.; International Project Risk Assessment: Methods, Procedures, and Critical Factors (Center Construction Industry Studies, Report No. 31, The University of Texas at Austin) Austin, Texas. (2003), 41-49.
FIDIC © Conditions of contract for construction. (Multilateral Development Bank Harmonized Edition). Geneva, Switzerland. (2005), 217-229.
Armbruster J.; Research Journal, 83(1978) 88- 91.
Mahdi S., Muhammad S.; Proc. 1st International Conference on Earthquake Engineering (ICCE), Lahore, Pakistan, (2006), 177-182.
D'Appolonia E.; Proc. of 9th International Conference on Soil Mechanics and Foundation Engineering,Tokyo, Japan, 4(1979), 410-414.
PMBOK® Guide; A Guide to the Project Management Body of Knowledge, 3rd Edition, PA, USA, (2004), 237-264.
Peter C., Robert P.; Proc. 2nd International Deepwater Pipeline Technology Conference. London, UK, (1999), 291-297.
Conditions of Contract for EPC/Turnkey Projects, Guidance for the preparation of the particular Conditions Forms of Tender, Contract Agreement and Dispute Adjudication Agreement, USA, (1999), 4-12.
Sher Muhammad Ch.; Introduction to statistical theory, Ilmi Kitab Khana, Urdu Bazar, Lahore, Pakistan, 6th Ed, (1996), 361-370.
Susan R. P.; Proc. Int. Conference on Risk Assessment and Policy Association meeting in Alexandria, Virginia, (1997), 245-255.
Brenda McCabe; Proc. Int. Conference on Simulation, Toronto, Canada, (2003), 1561- 1565.
Jack R., Meredith, Samuel J., Mantel Jr.; Project Management, 5th Ed, NJ, USA, (2002), 191- 105.
Wells Louis, Gleason Eric; Harvard Business Review Journal, 73(5)(1995) 44-54.
CPM 128: Project Management Boot Camp, (2006), 11.1-11.30.
www.intaver.com/accessed on 10th March, 2007
Annual Flood Report; Ministry of Water and Power, Islamabad, Pakistan, (2006), 1-5 also available online on http://www.pakistan.gov.pk/ministries/index.jsp ?MinID=24&cPath=291.
User’s Guide to RiskyProject Professional 1.3, Intavar Institute Inc., USA, (2006), 31-38.
ACCESS